Oil & Gas
Success story: ExxonMobil (Cameroon)Pipeline Compression substation E-house for power supply
I. CUSTOMER ENVIRONMENT / PROJECT CONTEXTCustomer profile (*):
Customer objective and constraints (*):
II. SOLUTION IMPLEMENTATIONImplementation methodology (main phases) (*):
Definition: choice and sizing of equipement, layout and connction diagrams, etc. Design and manufacture: of 10 substations with large prefabricated metal buildings to house all the devices. Technical operation and maintenance files. Duration:
Solution overview (services, products, systems, architectures…) (*):Shelter composition:
The substations are fed by transformers connected to the 33 and 63 kV lines of the local electrical distribution network. The shelters feed the MV and LV motors of the compression stations by means of 63-33/6.6 kV and 6.6 kV/480V step-down transformers. Key data:
III. RESULTS / ACHIEVEMENTCustomer benefits (*):
Schneider Electric differentiating values VS competitors:
|